Method for calculating costs of underground storage tank closure at Fort Dix, NJ
Title
Method for calculating costs of underground storage tank closure at Fort Dix, NJ [microform] / by Kemal Piskin, Bernard A. Donahue.
Published by
Champaign, Ill. : US Army Corps of Engineers, Construction Engineering Research Laboratory ; [Springfield, VA : National Technical Information Service, distributor, 1991]
Distributed to depository libraries in microfiche.
Shipping list no.: 92-1635-M.
"September 1991."
Bibliography (note)
Includes bibliographical references (p. 22-23).
Type of report (note)
Final.
Reproduction (note)
Microfiche.
Funding (note)
U.S. Army Engineering and Housing Support Center.
Author
Piskin, Kemal.
Title
Method for calculating costs of underground storage tank closure at Fort Dix, NJ [microform] / by Kemal Piskin, Bernard A. Donahue.
Imprint
Champaign, Ill. : US Army Corps of Engineers, Construction Engineering Research Laboratory ; [Springfield, VA : National Technical Information Service, distributor, 1991]
Series
USACERL special report ; N-91/28
USA-CERL special report ; N-91/28.
Type of report
Final.
Bibliography
Includes bibliographical references (p. 22-23).
Funding
U.S. Army Engineering and Housing Support Center. PE 4A162720, PR A896, WU AO-032.
Reproduction
Microfiche. [Washington, D.C.?] : Supt. of Docs., U.S. G.P.O., [1992] 1 microfiche : negative.